The Infrastructure

The Chatham-Siler City Advanced Manufacturing site has high quality transportation and utility infrastructure that helps drive business. The network strengthens our business community and makes it easy to stay connected.

Water

Size: 16” on site
Capacity: 4.0 MGD

Waterwaste

Size: 21” line on site. 
Timeline: Right of Way acquired. Permitting is complete. Expected delivery: 12 months
Capacity: 2MDG capacity available 2025

Natural Gas

Size: 6” line onsite.
Timeline: 18 months
Provider: Dominion Energy

Electric

Network: 150 megawatts available; 230 KV single circuit on site
Provider: Duke Energy or Randolph Electric

Fiber Optic

On Site, Multiple Providers available.

Roads

Direct access to Highway 64   
Planning and preliminary design in progress for a proposed interchange on US 421. I-685 is on the schedule as an upgrade to 421

Rail

Air

2 international airports within 50 miles