The Chatham-Siler City Advanced Manufacturing site has high quality transportation and utility infrastructure that helps drive business. The network strengthens our business community and makes it easy to stay connected.
Water
Size: 16” on site
Capacity: 4.0 MGD
Waterwaste
Size: 21” line on site.
Timeline: Right of Way acquired. Permitting is complete. Expected delivery: 12 months
Capacity: 2MDG capacity available 2025
Natural Gas
Size: 6” line onsite.
Timeline: 18 months
Provider: Dominion Energy
Electric
Network: 150 megawatts available; 230 KV single circuit on site
Provider: Duke Energy or Randolph Electric
Fiber Optic
On Site, Multiple Providers available.
Roads
Direct access to Highway 64
Planning and preliminary design in progress for a proposed interchange on US 421. I-685 is on the schedule as an upgrade to 421
Rail
Easy on-site access Norfolk Southern Prime Rail Site
Air
2 international airports within 50 miles