The Megasite

Site Access

The megasite has direct access to US 64, a four-lane divided highway. View the proposed improvements. The interchange and connector road will provide secondary truck access from the four-lane divided highway to the site.

1,320-Acre Megasite

  • 1,320-acre area

  • 11.6 million square ft building potential
  • Direct access to Highway 64

  • Planning and preliminary design in progress for a proposed interchange on US 421

Location

Five of the largest cities in North Carolina are within 100 miles of the site. Five of the 10 largest universities in North Carolina are within 50 miles of the site. See a regional view of the site.

Zoning

Siler City Zoning Jurisdiction – zoned Heavy Industrial.   Datacenter use permitted by right.

Utilities

Electricity: 150MW “with a path" to 300MW 2030; 230 KV power line on site

Water System: 16” line on site.  2MGD capacity

Wastewater System: 21” line on site. .5MGD capacity

Masterplan

The master plan shows an industrial park sited on approximately 1,320 acres. It consists of 24 lots, including five large lots with potential facilities ranging from 600,000 to 2 million square feet.

Megasite Details (1,320-Acres)

Hydrology: Stream and wetland features have been delineated and surveyed. Jurisdictional documents have been approved by the United States Army Corps of Engineers.

Elevation: Overall average slopes from ridgeline to low points range between 2 to 5%.

Slope: More than 80% of the site comprises of slopes less than 10%, which are optimal for development.

Area: With more than 1,320 acres, this site provides an optimal location for a large-scale manufacturing facility.

Masterplan: The master plan shows an industrial park sited on approximately 1,320 acres. It consists of 24 lots, including five large lots with potential facilities ranging from 600,000 to 2 million square feet.

CAM Site

P.O. Box 1627 Pittsboro, NC 27312